The Influence Of Quay Container Crane Performance And Container Yard Capacity On Increasing Container Throughput At TPK KOJA
Abstract
This study examines the influence of quay container crane performance and yard capacity on increasing container throughput at Koja Container Terminal (TPK Koja). The main problem is the long waiting time for increased containers, averaging 3.5 days, which exceeds the government standard of 3 days. This condition reflects inefficiency in terminal operations and infrastructure, particularly the poor condition of container cranes at berths 1 and 6 of berth 7, as well as limited yard space that cannot accommodate the increasing volume of containers. The research applies a quantitative approach by collecting data through field observations, interviews, and questionnaires distributed to employees of the terminal operations division at TPK Koja. Data are analyzed using statistical methods to examine the effect of two independent variables, quay container crane performance (X1) and yard capacity (X2), on container throughput (Y). The results are expected to provide insights for increasing operational efficiency and supporting better terminal performance.
Keywords
Full Text:
PDFReferences
Abdurachman, E., Arifiani, L., Simarmata, J., Suryobuwono, A. A., Sholihah, S. A., Octaviani, R. D., Firdaus, M. I., Yuliantini, Olfebri, Keke, Y., Sihombing, S., Tatiana, Y., Saribanon, E., Ricardianto, P., Sari, M., Banjarnahor, A. R., Susanto, P. C., & Gunawan, A. (2025). Metode Penelitian Transportasi dan Logistik (A. R. Banjarnahor (ed.)). Damera.
Asbullah, Ginting, D., & Suparman. (2024). Analisis Keterlambatan dan Efisiensi Kegiatan Bongkar Muat Petikemas di Terminal PT Prima Terminal Petikemas Belawan. Journal Of Social Science Research, 4(1), 10156–10166.
Bangunan, J. S. (2024). Jurnal sains bangunan. 1(1), 49–56.
Bimarso, W., Warsito, B., M. R, T., & Triantoro, W. (2024). Pedoman Pemeliharaan Fasilitas Bangunan Sipil Pelabuhan berupa Dermaga, Lapangan Penumpukan dan Gudang (Edisi 1). ITL Trisakti Press.
Candra Susanto, P., Ulfah Arini, D., Yuntina, L., Panatap Soehaditama, J., & Nuraeni, N. (2024). Ranjbar, H., & Khosravi, S. (2015). The Effect of Using Likert Scale on the Validity of Research Results. International Journal of Humanities and Cultural Studies. Jurnal Ilmu Multidisplin, 3(1), 1–12.
Ellenlies, E., Siahaan, L. D., Ayutia, Y., Andarini, A., Hiero Rio Kasenda, M., & Parhusip, V. (2021). Perbaikan Kinerja Dwelling Time Di Terminal Peti Kemas KOJA di Pelabuhan Tanjung Priok. Jurnal Sistem Transportasi & Logistik, 1(2), 52–60.
Koleangan, R. M. (2008). Manajemen Kepelabuhanan. Erlangga.
Kuswandini et al. (2019). Bab 1 pendahuluan. Pelayanan Kesehatan, 2016(2014), 1–6. http://library.oum.edu.my/repository/725/2/Chapter_1.pdf
Lasse, D. A. (2014). Manajemen Kepelabuhanan (Edisi 1). Rajawali Pers.
Leela, L., Kumar, A., & Bhanusri, C. (2022). Apply Lean Methodology to Improve Reliability of Crane Sanketika Vidya Parishad Engineering College , India. 10(9), 83–86.
Lesmini, L., & Fadhlurrahman, D. R. (2021). Kinerja Quay Container Crane Dalam Kegiatan Bongkar Muat Petikemas Di Kso Terminal Petikemas Koja Jakarta Utara. Jurnal Transportasi, Logistik, Dan Aviasi, 1(1), 55–64.
Logahan, J. M., & Amril. (2016). Pengaruh Pelayanan Kapal, Peralatan Bongkar Muat dan Operator Bongkar Muat Terhadap Kinerja Terminal Peti Kemas di JICT Tanjung Priok. Jurnal Manajemen Dan Bisnis ASMI, 2(1), 39–42.
Mutiara Lintang, Y., Nugraha, B., Kasan Gupron, A., & Pelayaran Surabaya, P. (2024). Analisis Faktor yang Mempengaruhi Standar Waktu Pelayanan Truck Round Time PT Terminal Peti Kemas Surabaya. Jurnal Bintang Pendidikan Indonesia, 2(4), 241–263.
Notoatmodjo, S. (2009). Pengemangan Sumber Daya Manusia. Rineka Cipta.
Putri, K. W., & Rahmawati, A. (2022). Analisis Kapasitas Dermaga Terminal Petikemas Makassar New Port Berdasarkan Nilai Berth Occupancy Ratio (Bor) Dan Berth Throughput (Btp). Riset Sains Dan Teknologi Kelautan, 5(2), 143–150.
Ramadani, A. (2022). Analisa Pengaruh Waktu Tunggu Kapal Terhadap Biaya Logistik Di Terminal Peti Kemas Makassar. Riset Sains Dan Teknologi Kelautan, 5(2), 168–174. https://doi.org/10.62012/sensistek.v5i2.24750
Ridwan, Luhur, A., & Elnath G, M. (2023). Pengaruh Performa Quay Container Crane dan Penerapan System Single Cycle dan Dual Cycle Terhadap Bongkar Muat Peti Kemas di KSO Peti Kemas Koja Jakarta. Jurnal Maritim Polimarin, 9(1), 45–57.
Sedarmayanti. (2011). Manajemen Sumber Daya Manusia: Reformasi Birokrasi dan Manajemen Pegawai Negeri Sipil (Cetakan ke). PT Refika Aditama.
SHELEMO, A. A. (2023). No Titleیلیب. Nucl. Phys., 13(1), 104–116.
Siti, S., & Nabila, A. (2023). Upaya Meningkatkan Kinerja Pekerja Operator Peralatan Bongkar Muat Dan Kesiapan Fasilitas Peralatan Bongkar Muat Petikemas di KSO Terminal Petikemas Koja. Journal Of Social Science Research, 3(06), 9742–9756.
Supriyono, S. (2010). Analisis Kinerja Terminal Petikemas di Pelabuhan Tanjung Perak Surabaya. Universitas Diponegoro.
Syayuti, F., Thamrin, M., Majid, S. A., Sihombing, S., & Liana, E. (2023). Produktivitas Terminal dan Kinerja Operasional di Pelabuhan Tanjung Priok. Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG), 10(2), 155.
Triatmogjo, B. (2016). Manajemen Kepelabuhanan. Beta Offset.
Wibowo, Prof. Dr., S.E., M. P. (2010). Manajemen Kinerja (Edisi 3). Rajawali Pers, Jakarta.
DOI: https://doi.org/10.25292/atlr.v8i0.774
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Advances in Transportation and Logistics Research

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Advances in Transportation and Logistics Research
ISSN: 2622-5778 (online)
Published by: Institut Transportasi dan Logistik Trisakti, Jakarta - Indonesia
![]()
ATLR by http://proceedings.itltrisakti.ac.id/index.php/ATLR is licensed under a Creative Commons Attribution 4.0 International License.