Implementation of Lean Manufacturing in Determining Time Efficiency by Using VSM Method on Production Line of PT Astra Daihatsu Motor in Jakarta
Abstract
Keywords
Full Text:
PDFReferences
Daonil, 2012. Implementasi Lean Manufacturing Untuk Eliminasi Waste pada Lini Produksi Machining Cast Wheel Dengan Menggunakan Metode Wam dan Valsel. Tesis. Program Studi Teknik Industri. Pascasarjana Universitas Indonesia. Depok.
Gaspersz, Vincent. 1997. Manajemen Kualitas Penerapan Konsep- konsep Kualitas daam Manajemen Bisnis Total. PT Gramedia Pustaka Utama. Jakarta
Goriwondo, WM Use of the Stream Mapping Tool for waste Reduction in Manufacturing.Tesis. Department of Industrial and Manufacturing Engineering. University of Science and Technology Zimbabwe.
Gaspersz, Vincent (2006). "Continuous Cost Reduction Through Lean Sigma Approach". PT Gramedia Pustaka Utama. Jakarta
HM Wee and Wu Simon. 2009. Supply Chain Strategies, Issues, and Models. U Ramadhan & R. Ramanathan. London
Hamidi. 2010. Metode Penelitian Kuantitatif. Malang: UMM Press.
DOI: https://doi.org/10.25292/atlr.v2i0.175
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 Advances in Transportation and Logistics Research

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Advances in Transportation and Logistics Research
ISSN: 2622-5778 (online)
Published by: Institut Transportasi dan Logistik Trisakti, Jakarta - Indonesia
![]()
ATLR by http://proceedings.itltrisakti.ac.id/index.php/ATLR is licensed under a Creative Commons Attribution 4.0 International License.


