Analysis of the Performance of Loading Unloading PT Agung Raya

Edward Marpaung, Yolla Ayutia, Paulus Raga, Veronica Veronica, Aprilia Putri Nurcantika Putri

Abstract


A good job is one where completion time is short and accurate. To support the progress and get the results of loading and unloading performance measurement, it is necessary to use the right method of working time measurement and workload calculation to provide accurate information on the optimal time and workload size. PT Agung Raya is a private company engaged in logistics services. This kind of research is quantitative. This study directly measured work time, namely 3 containers of stripping activities and 3 containers of release cargo activities. The time-motion study method aims to determine the standard time of each work element, the amount of productivity and non-productivity, and the optimal workload for stripping and release cargo activities. The result of the standard time for stripping activities is 82 minutes with 74% productivity and release cargo activities require 52.3 minutes to complete with 88% productivity. The results of the workload analysis for the stripping and release cargo activities, which are owned by the workforce, exceed 100%, so there are suggestions for additional labour.


Keywords


Stripping; Release Cargo; Time Motion; Productivity; Work load

Full Text:

PDF

References


Arif, R. (2012). Analysis of the optimal workload and number of workers in the production department with the Work Load Analysis method approach at PT Surabaya Perdana Rotopack.

Farhana, D. H. (2020). Workload analysis in determining the optimal number of workers with the workload analysis method at PT Jaya Teknik Indonesia. Scientifict Journal of Indsutrial Engineering, 1(2).

Monika Kussetya Ciptani. (2001). Increased productivity and cost efficiency through the integration of time & motion study and activity-based costing. Journal of Accounting and Finance, 3(1). http://puslit2.petra.ac.id/ejournal/index.php/aku/article/view/15679

Putra, S., Handoko, F., &; Haryanto, S. (2020). Workload Analysis Using Workload Analysis Method in Determining the Optimal Number of Workforce in CV. Jaya Perkasa Teknik, Pasuruan City. Valtech Journal (Journal of Industrial Engineering Students), 3(2), 82–85.

Sritomo Wignjosoebroto. (2006). Ergonomics of Motion and Time Studies: Analytical Techniques for Increased Work Productivity (4th ed.).

Zamrudi, I., &; Nursanti, E. (2020). Improvement of working methods through time and motion studies to increase aluminum foil production capacity. 3(1), 46–51.




DOI: https://doi.org/10.25292/atlr.v6i0.577

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Advances in Transportation and Logistics Research

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

Advances in Transportation and Logistics Research

ISSN: 2622-5778 (online)
Published by: Institut Transportasi dan Logistik Trisakti, Jakarta - Indonesia

ATLR by http://proceedings.itltrisakti.ac.id/index.php/ATLR is licensed under a Creative Commons Attribution 4.0 International License.