ANALYSIS OF CAPACITY DEVELOPMENT PLANNING BASED ON THE UPGRADING OF SINGLE TRACK TO DOUBLE TRACK ON THE PADALARANG-CICALENGKA LINE
Abstract
PT. Kereta Api Indonesia (Persero) initiated capacity development planning on the Padalarang-Cicalengka Line in 2019 to meet projected passenger increases, using the Moving Average method over three years to forecast passenger numbers from 2019 to 2033. Results indicate significant fluctuations in passenger volume during the initial period, primarily due to the COVID-19 pandemic's impact. Post-2024, a steady increase is observed, with projections reaching 617,364 passengers by 2026 and stabilizing around 595,000 to 600,000 passengers through 2033. Infrastructure enhancements, such as the development of double-track segments and a shift to electronic signaling, are key factors contributing to capacity growth and operational reliability. While capacity trends are stabilizing, challenges remain in single-track segments that must be addressed to support sustainable growth. The implementation of double-track segments on the Haurpugur-Cicalengka route increased line capacity by 133%, aligning with the planned rail program. Additionally, adjustments in track layout design have been made to meet projected passenger demand and prevent overloading in coming years.
Keywords
Full Text:
PDFReferences
Railway Traffic Chart (2023). Padalarang-Cicalengka Line. Badan Pusat Statistik. Passenger Data from 2019-2023.
Uned Supriyadi (2008). Book on Line Capacity. UU RI No. 23 Tahun (2007) about Railways.
Setiawan, D., Luthfiana, R., & Atmaja, S., (2018). Traffic Management at Cicalengka Station to Support the Operation of the Bandung-Cibatu Double Track. Semesta Teknika Journal. Vol. 21, No. 1, 1-9, May 2018.
Drajat, B., Hosang, J., Korah, T., Djajadi, & Uriansah (2017). Study of Double Track Development Plan at Cilame Station (Cikampek-Padalarang Line).
Jeremy, J., & Utomo, N. (2020). Planning Double Track for Railways at Wonokromo-Sidoarjo Station (Km 7+881-KM 25+510).
Hidayat, M.N. (2019). Development of a Model to Calculate Railway Line Capacity in Indonesia (Case Study of the Northern Line of Java Island from Pasarturi Station to Bujonegoro Station).
Nurrachman, F. (2023). Analysis of Capacity Development Planning Based on the Transition from Mechanical to Electrical Signaling at Merapi Station.
DOI: https://doi.org/10.25292/atlr.v7i0.718
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 Advances in Transportation and Logistics Research

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Advances in Transportation and Logistics Research
ISSN: 2622-5778 (online)
Published by: Institut Transportasi dan Logistik Trisakti, Jakarta - Indonesia
![]()
ATLR by http://proceedings.itltrisakti.ac.id/index.php/ATLR is licensed under a Creative Commons Attribution 4.0 International License.